Description
Founders Hall Renovation for Allied Health and Nursing, Naugatuck Community College
Waterbury, CT
Renovation of Founders Hall and Annex Building at Naugatuck Valley Community College, Waterbury.
The renovated facility will be home to the College’s Allied Health and Nursing Facilities. The renovated space shall incorporate some of the existing teaching programs currently residing in the building as well as general purpose classrooms featuring technology based teaching systems. The program includes: large well-equipped laboratories with resources for simulated learning that can be used by all disciplines, a mixture of large and small classrooms with ‘Smart’ technology, conference rooms, gathering spaces for group study and faculty offices that provide for tutoring and advising.
Construction estimate: $25,947,543.00 will include the renovation of 82,000 square feet
Infrastructure Design and Construction Administration for Low Voltage Systems:
Client coordination meetings, Design and specifications for infrastructure design for Data (including wireless), Voice, Video, CATV Design, Coordination with Architect and MEP engineer on design and documentation of the project.
Equipment (FF&E) Design, Procurement, and Project Management for:
Data Headend System, Voice system, specify, Procure and coordinate installation of loose equipment, including but not limited to LAN, WLAN, etc., as required to meet owner requirements.
GTC will provide design services to address the various technology needs of the project in conjunction with local technology integration plans and implementation standards.
Rockville Public Library
Vernon CT
Technology Design Consulting Services
The Scope of Services shall include the preparation of designs and specifications for the facility.
Infrastructure Design and Construction Administration for Low Voltage Systems:
Building Network Infrastructure Cabling: Data, Pathways grounding and bonding, Voice, VoIP, Wireless System, CATV System, Security CCTV Equipment, Local Area Network Head End, Phone System Head End, Wireless System Head End, CATV amplification
Services included GTC joint meetings with the Owner as required for programming, design consultation, and procurement for equipment and items as listed herein.
LEGO System Inc. Phase 1 and Phase 7 Expansion
Enfield, CT
Status: Construction Phase
GTC was involved in the technology engineering services for a complete interior renovation of 91,408 SF of existing space.
Infrastructure Design and Construction Administration for Low Voltage Systems:
Voice, Data, Video, Video Presentation, LCD Projector Infrastructure
Telephone, LAN-Data, Video Distribution, Local Sound System, LCD Projector Equipment Design (Construction Documents, Bid Documents, Construction Administration)
Capitol Region Education Council Public Safety Academy
Enfield, CT Grades: 6-12
Status: Construction Phase
New construction of a single high school program of 145,000 square feet, the building will be design for 700 students 6-12.
Infrastructure Design and Construction Administration for Low Voltage Systems:
Client coordination meetings, Design and specifications for infrastructure design for Data (including wireless), Voice, Video, PA/Intercom, Clock, Intrusion detection, Access control, Video surveillance (CCTV), Local Sound System, Coordination with Architect and MEP engineer on design and documentation of the project.
Equipment Design, Procurement, and Project Management for:
Voice system, Public Address / Intercom system, Clock system, Local Sound systems, and integrated Intrusion Alarm, CCTV Video Surveillance and Access Control Systems.
Equipment (FF&E) Design, Procurement, and Project Management for:
Specify, Procure and coordinate installation of loose equipment, including but not limited to LAN, WLAN, and WAN Data Electronics, Computer systems, Audiovisual Presentation Systems, Speech/Sound Reinforcement systems. Computer equipment, Computer software, etc., as required to meet owner requirements (Phase 2, FF&E).
GTC will provide design services to address the various technology needs of the project in conjunction with local technology integration plans and implementation standards.
Highland Park School, Additions and Renovations
397 Porter St. Manchester, CT 06040 Grades: K-5
Infrastructure Design and Construction Administration for Low Voltage Systems: Technology design services for an existing 54,000sf building with a 2,000sf addition. WAN/WLAN/LAN Data, Voice, Video, Public Address / Intercom, Clock, Audio Visual Presentation, Local Sound, Speech/Sound Reinforcement, Intrusion Alarm, Video Surveillance (CCTV), and Access Control Systems.
Equipment Design, Procurement, and Project Management for:
Voice system, Public Address / Intercom system, Clock system, Local Sound systems, and integrated Intrusion Alarm, CCTV Video Surveillance and Access Control Systems.
Equipment (FF&E) Design, Procurement, and Project Management for:
LAN, WLAN, and WAN Data Electronics, Computer systems, Audiovisual Presentation Systems, Speech/Sound Reinforcement systems.
LEGO Building Renovation
Enfield, CT
GTC was involved in the technology engineering services for a complete interior renovation of 90,000 SF of existing space.
Infrastructure Design and Construction Administration for Low Voltage Systems:
Voice, Data, Video, Video Presentation, SmartBoard and LCD Projector Infrastructure Telephone, LAN-Data, Video Distribution, Local Sound System, LCD Projector Equipment Design (Construction Documents, Bid Documents, Construction Administration)
Hanover Elementary School, Additions and Renovations
Meriden, CT.
Infrastructure Design and Construction Administration for Low Voltage Systems:
Gilmartin School
107 Wyoming Ave., Waterbury, CT 06706 Grades: PreK-8
Infrastructure Design and Construction Administration for Low Voltage Systems: WAN/WLAN/LAN Data, Voice, Video, Public Address / Intercom, Clock, Audiovisual Presentation, Local Sound, Speech/Sound Reinforcement, Intrusion Alarm, Video Surveillance (CCTV), and Access Control Systems.
Equipment Design, Procurement, and Project Management for:
Voice system, Public Address / Intercom system, Clock system, Local Sound systems, and integrated Intrusion Alarm, CCTV Video Surveillance and Access Control Systems.
Equipment (FF&E) Design, Procurement, and Project Management for:
LAN, WLAN, and WAN Data Electronics, Computer systems, Multi-media and Audiovisual Presentation Systems, Speech/Sound Reinforcement systems, and Video Bulletin Board system.
Bloomfield High School
5 Huckleberry Lane, Bloomfield, CT
Square Footage: 185,000 existing square feet and the addition of a 12,817 square foot new Media Center for a high school
Student Capacity: 680
Infrastructure Design and Construction Administration for Low Voltage Systems:
Design consulting, project management, and construction administration for Voice, Data, Wireless LAN, Video, PA/Intercom, Master Clock, TV Studio, Music Midi Lab, and extension of existing CCTV Video Surveillance, Intrusion Detection and Access Control Systems.
Major considerations include preservation and re-use of existing equipment for systems to be expanded, and continuation of services of all technology systems for the occupied building during the six construction phases.
Capital Preparatory Magnet School
960 Main St., Hartford, CT 06103
Infrastructure Design and Construction Administration for Low Voltage Systems:
Voice, Data, Video, Sound, Intrusion, CCTV, Access Control, Video Presentation, SmartBoard and LCD Projector Infrastructure
(Construction Documents, Bid Documents, Construction Administration)
Telephone, LAN-Data, Video Distribution, PA/Intercom, Master Clock, Local Sound System, Intrusion, CCTV, Access Control, Video Presentation, SmartBoard and LCD Projector Equipment Design (Construction Documents, Bid Documents, Construction Administration)
Amity High School
25 Newton Rd., Woodbridge, CT
Infrastructure Design and Construction Administration for Low Voltage Systems:
The project consisted of classroom additions of nearly 90,000 square feet and limited renovations to the existing spaces. Voice, Data, Video, Sound, Intrusion, CCTV, Access Control, Video Presentation, SmartBoard and LCD Projector Infrastructure (Construction Documents, Bid Documents, Construction Administration).
Telephone, LAN-Data, Video Distribution, PA/Intercom, Master Clock, Local Sound System, Intrusion, CCTV, Access Control, Video Presentation, SmartBoard and LCD Projector Equipment Design (Construction Documents, Bid Documents, Construction Administration)
Orange Middle School
Ohman Avenue, Orange, CT 06477
Renovations to a 90,000 square foot Junior High School.
Infrastructure Design and Construction Administration for Low Voltage Systems:
Voice, Data, Video, Sound, Intrusion, CCTV, Access Control, Video Presentation, SmartBoard and LCD Projector Infrastructure
Telephone, LAN-Data, Video Distribution, PA/Intercom, Master Clock, Local Sound System, Intrusion, CCTV, Access Control, Video Presentation, SmartBoard and LCD Projector Equipment Design (Construction Documents, Bid Documents, Construction Administration)
Bethany Middle School
190 Luke Hill Road, Bethany, CT 06524 Student Capacity: 400, Square Footage: 89,000
Infrastructure Design and Construction Administration for Low Voltage Systems:
Voice, Data, Video, Sound, Intrusion, CCTV, Access Control, Video Presentation, SmartBoard and LCD Projector Infrastructure
(Construction Documents, Bid Documents, Construction Administration)
Telephone, LAN-Data, Video Distribution, PA/Intercom, Master Clock, Local Sound System, Intrusion, CCTV, Access Control, Video
Presentation, SmartBoard and LCD Projector Equipment Design (Construction Documents, Bid Documents, Construction Administration)
Linden Street Elementary School Additions and Renovations
69 Linden Street, Plainville, CT
Infrastructure Design and Construction Administration for Low Voltage Systems:
Technology design services for a 74,000 SF addition to an existing 36,000 SF school building. Equipment room and the telecommunication room requirements WAN/WLAN/LAN Data, Voice, Video, Public Address / Intercom, Clock, Audio Visual Presentation.